PT
Unrestrained Construction or Neglected Urban Rehabilitation?
Press
|
in Magazine Imobiliário
26 Nov 2026

Unrestrained Construction or Neglected Urban Rehabilitation?

Unrestrained Construction or Neglected Urban Rehabilitation?

In recent years, real estate developments have multiplied, new projects have been announced and legislative changes have been introduced to simplify urban planning procedures and accelerate construction. The underlying strategy seems clear: build more to address the housing shortage.

But is that the only solution?

According to data published by Statistics Portugal (INE), 48,844 residential units were licensed in 2025, the highest figure since 2011. Despite this, house prices continued to rise, with the median sales price per square metre increasing by 16.8% over the same period.

These figures show that the problem cannot be analysed from a purely quantitative perspective. Building more may be necessary, but it is not enough. It is equally important to understand where construction takes place, who it is intended for and the consequences of these choices for the territory and the quality of urban life.

At the same time as new developments are emerging, vacant buildings, deteriorating properties and abandoned spaces continue to exist in many areas of our cities. In several cases, these properties are located in areas already served by infrastructure, public transport, community facilities and established services.

A walk through many urban centres is enough to reveal this contradiction. While new developments and urban planning operations in expansion areas are being discussed, a significant part of the existing building stock remains vacant or underutilised.

Urban rehabilitation is not always straightforward. Costs can be high, technical processes complex and legal obstacles significant. Nevertheless, it is difficult to understand a housing policy that continues to rely almost exclusively on new construction, relegating the recovery of existing properties to a secondary role.

For this reason, rehabilitation cannot depend solely on property owners' initiative. It requires consistent public policies, appropriate incentives, legal certainty and mechanisms capable of addressing situations of prolonged neglect and deterioration.

This is precisely where local authorities play a decisive role. Beyond assessing planning permission applications or prior notifications, municipalities are responsible for setting urban development priorities, promoting the regeneration of degraded areas and ensuring that cities grow in a balanced and sustainable manner.

The Legal Framework for Urban Rehabilitation provides a range of instruments that have not always received the public attention they deserve. These include the designation of urban rehabilitation areas, compulsory works and, in certain circumstances, compulsory leasing.

The latter mechanism deserves closer consideration. Although the extension of compulsory leasing to vacant homes, introduced under the Mais Habitação (More Housing) programme, was subsequently repealed, the mechanism itself remains in place within the framework of urban rehabilitation. Whenever a municipality carries out compulsory works and the property owner fails to reimburse the costs incurred, the law allows recourse to compulsory leasing as a means of ensuring that the property is put to use and recovering the expenses incurred.

Should this instrument play a more prominent role in the debate on the rehabilitation of existing buildings? To what extent could it help bring properties that have remained deteriorated or abandoned for years back onto the housing market? These are questions that deserve serious discussion, particularly in a context where more efficient use of existing urban resources is required.

Meanwhile, the legislator has continued to pursue a strategy of simplifying urban planning procedures, notably through the so-called Urban Planning Simplex and the amendments introduced to the Legal Framework for Urbanisation and Building.

Reducing bureaucracy is undoubtedly a legitimate objective. No one benefits from excessively lengthy procedures or unnecessary administrative requirements. However, simplification must not come at the expense of sound urban planning. On the contrary, the less extensive the prior administrative intervention, the greater the need for clear rules, rigorous enforcement and accountability on the part of all those involved.

The urgency to build cannot be used as an argument for accepting urban planning solutions that disregard infrastructure capacity, the availability of green spaces, mobility needs or environmental sustainability objectives. Cities should not be measured solely by the number of buildings they can accommodate, but also by the quality of the spaces in which people live.

Urban rehabilitation therefore represents much more than a policy of heritage preservation. It is also an opportunity to restore housing, revitalise urban centres, reuse existing infrastructure and reduce pressure to develop new land.

Naturally, new construction will continue to be essential in many areas. There are locations where housing supply is clearly insufficient and new projects are indispensable. The challenge is not to choose between building and rehabilitating, but rather to strike a balance that makes the most of both approaches.

It would be a mistake to look at the housing crisis solely through the number of homes we are able to build. In many cities, part of the solution already exists and is there for everyone to see: vacant buildings, deteriorating properties and urban heritage awaiting a second chance. Perhaps the real challenge is not simply to develop new spaces, but also to restore what we already have.